project detail

39 durham street

  repair and strengthening

Piles were driven to 24 metres
Preparation for foundation beam pour
 
Co-ordinating slab demolition, pile driving, and preparation to lay new sacrificial slab
 

 

New steelwork strengthens the superstructure

 

 
Sidera arranged cost sharing for party walls

 

 
Piling supports exterior walls
 

 

  building fit-out

Tenant and building owner specialized data and security systems were integrated
 
Sidera was contracted to manage the interior fit-out
 
Fit-out included staff facilities and a kitchen area