project detail

garden city bowl

 Crack injection work was required in floors and
most walls of the tilt slab building

 

  
 The roof was damaged requiring waterproofing
and sealant repairs

 

Sealants ruptured by tilt slab panel movement
were repaired

 

The building exterior was re-painted