project detail
garden city bowl
Crack injection work was required in floors andmost walls of the tilt slab building |
The roof was damaged requiring waterproofingand sealant repairs |
|
Sealants ruptured by tilt slab panel movementwere repaired |
The building exterior was re-painted |
